@MISC{Inter-Enterprise_ist-1999-10357, author = {Engineering Co-Operative Inter-Enterprise and Niamh Quinn (bri}, title = {Ist-1999-10357}, year = {} }
Share
OpenURL
Abstract
This deliverable presents the setup of Trial 2. Trial 2 represents the second and last evaluation phase of the FORM project. Trial 2 assessed the overall results of the project including all the components of the InterEnterprise Management Framework. The documentation of the final project trial (Trial 2) provides information on the trial infrastructure, trial test cases and evaluation based on the operational requirements and the development aspects. The structure of Trial 2 is presented; the four test teams within the project demonstrated their management systems. These demonstrations were then assessed against the operational requirements for the Inter-Enterprise service, which were drawn up at the beginning of the project. The development aspects of an Open Development Framework in which management systems for an IES can be developed commercially were also evaluated.