|
6
|
Profile Scheduling of Opposing Forests and Level Orders
– D Dolev, M K Warmuth
- 1985
|
|
6
|
Scheduling Precedence Graphs of Bounded Height
– D Dolev, M K Warmuth
- 1984
|
|
5
|
Scheduling Flat Graphs
– D Dolev, M K Warmuth
- 1985
|
|
3
|
Scheduling Opposite Forests
– M R Garey, D S Johnson, R E Tarjan, M Yanakakis
- 1983
|
|
4
|
The existence of Probability Measures with Given
– V Strassen
- 1965
|
|
1
|
On the Optimal Stochastic Scheduling of Out-Forests, Rapport de Recherche INRIA
– E G Coffman, Z Liu
- 1990
|
|
9
|
On stochastic scheduling with in-tree precedence constraints
– C H Papadimitriou, J N Tsitsiklis
- 1987
|
|
9
|
Scheduling partially ordered tasks with probabilistic execution times
– K M Chandy, P F Reynolds
- 1975
|
|
9
|
On scheduling tasks with exponential service times and in-tree precedence constraints
– J Bruno
- 1985
|
|
6
|
A stochastic scheduling problem with intree precedence constraints
– E Frostig
- 1988
|
|
7
|
Scheduling jobs with exponentially distributed processing times and intree precedence constraints on two parallel machines
– M Pinedo, G Weiss
- 1985
|
|
3
|
Stochastic Scheduling with Variable Profile and Precedence Constraints
– Zhen Liu, Centre Sophia Antipolis, Eric Sanlaville
- 1991
|
|
34
|
M.: Scheduling interval-ordered tasks
– C H Papadimitriou, Yannakakis
- 1979
|
|
155
|
NP-complete scheduling problems
– J D Ullman
- 1975
|