|
17
|
O-Plan: a Knowledge-Based Planner and its Application to Logistics
– Austin Tate, Brian Drabble, Jeff Dalton
- 1996
|
|
15
|
Characterising Plans as a Set of Constraints - the I-N-OVA Model - A Framework for Comparative Analysis
– Austin Tate
- 1995
|
|
4
|
O-Plan's PlanWorld Viewers
– Austin Tate, Brian Drabble
- 1995
|
|
4
|
The Emergence of "Standard" Planning and Scheduling System Components -- Open Planning and Scheduling Architectures
– Austin Tate
- 1993
|
|
10
|
Comparing Partial Order Planning and Task Reduction Planning: A preliminary report
– Subbarao Kambhampati
- 1994
|
|
18
|
A Comparative analysis of Partial Order Planning and Task Reduction Planning
– Subbarao Kambhampati
- 1995
|
|
|
O-Plan - Architecture Guide Version 2.3
– Austin Tate, Brian Drabble, South Bridge
- 1995
|
|
5
|
O-Plan: A Situated Planning Agent
– Brian Drabble, Austin Tate
|
|
24
|
The Use of Optimistic and Pessimistic Resource Profiles to Inform Search in an Activity Based Planner
– Brian Drabble, Austin Tate, South Bridge
- 1994
|
|
2
|
PlanWorld Viewers
– Austin Tate, Brian Drabble
|
|
1
|
Putting Knowledge Rich Plan Representations to Use
– Austin Tate
- 1993
|
|
4
|
On Building a Planning Tool Box
– Joachim Hertzberg
- 1995
|
|
13
|
Knowledge-Level Analysis of Planning Systems
– AndrĂ© Valente
- 1995
|
|
96
|
Temporal Planning with Continuous Change
– J. Scott Penberthy, Daniel S. Weld
- 1994
|
|
7
|
CommonKADS Models for Knowledge Based Planning
– John Kingston, Nigel Shadbolt Ai Group
- 1996
|
|
3
|
Open Planning, Scheduling and Constraint Management Architectures for Virtual Manufacturing
– Howard Beck, Austin Tate
- 1995
|
|
20
|
Associating A.I. Planner Entities with an underlying Time Point Network
– Brian Drabble, Richard Kirby
- 1991
|
|
13
|
The Intentional Planning System (ITPLANS)
– Christopher William Geib
- 1994
|
|
91
|
O-Plan2: an Open Architecture for Command, Planning and Control
– Austin Tate, Brian Drabble, Richard Kirby
- 1994
|