Results 1 - 10
of
26
1 Progress in Addressing DNFSB Recommendation 2002-1 Issues: Improving Accident Analysis Software Applications (U)
"... Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2002-1 (Quality Assurance for Safety-Related Software) identified a number of quality assurance issues on the use of software in Department of Energy (DOE) facilities for analyzing hazards, and designing and operating controls to prevent ..."
Abstract
- Add to MetaCart
Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2002-1 (Quality Assurance for Safety-Related Software) identified a number of quality assurance issues on the use of software in Department of Energy (DOE) facilities for analyzing hazards, and designing and operating controls
Dear Mr. Chairman:. COMPLETION OF THE DEFENSE NUCLEAR FACILlTlES SAFETY BOARD (DNFSB) RECOMMENDATION 93-5 IMPLEMENTAnON PLAN (IP), REVISION I, MILESTONE 5.5.6. La, "COMPLETION OF HIGH PRIORITY TANKS (HPT) SAMPLING AND
"... ANALYSIS FOR DISPOSAL, " AND MILESTONE 5.6.3.I.g, "COMPLETION OF HIGH PRIORITY TANKS (HPT) SAMPLING AND ANALYSIS" Delays in completing equipment modifications allowing rotary core sampling in flammable gas environments limited the US. Departm'ent of Energy, Richland Operations Of ..."
Abstract
- Add to MetaCart
analyses to support the conclusion thatthe intent of DNFSB Recommendation 93-5 IP, Milestones 5.5.6.1.a and 5.6.3.1.g, are met. Condensed phase samples from 144 tanks along with data from 82 vapor samples provide sufficient information to address and resolve the nine safety related questions and three
Attachment
, 1996
"... DNFSB Recommendation 93-5 Implementation Plan, Rev. O. As the DNFSB is aware, a revised version of this Implementation Plan was ..."
Abstract
- Add to MetaCart
DNFSB Recommendation 93-5 Implementation Plan, Rev. O. As the DNFSB is aware, a revised version of this Implementation Plan was
• Commitment 1.23, IIIdentify Bounding Tanks for Disp...
, 1996
"... The purpose of this letter is to give an update of the status regarding the DNFSB Recommendation 93-5 Implementation Plan commitments that are due ..."
Abstract
- Add to MetaCart
The purpose of this letter is to give an update of the status regarding the DNFSB Recommendation 93-5 Implementation Plan commitments that are due
TRANSMITTAL OF THE DEFENSE NUCLEAR FACILITIES SAFETY BOARD (DNFSB)
, 1998
"... report addresses issues and milestones as presented in Recommendation 93-5 IP, Revision 1. ..."
Abstract
- Add to MetaCart
report addresses issues and milestones as presented in Recommendation 93-5 IP, Revision 1.
Department of Energy Letter Forwarding the Test Summary Report for Process Verification Testing
, 1997
"... defined in the Implementation Plan for DNFSB Recommendation 96-1 (Commitment number 3, Milestone 5.2.2-3). This test report summarizes the objectives, procedures, results and conclusions of the PVT-1. ..."
Abstract
- Add to MetaCart
defined in the Implementation Plan for DNFSB Recommendation 96-1 (Commitment number 3, Milestone 5.2.2-3). This test report summarizes the objectives, procedures, results and conclusions of the PVT-1.
:z: ~..l
, 1997
"... Enclosed is the Test Summary Report for the Process Verification Test (PVT-1) which is a deliverable defined in the Implementation Plan for DNFSB Recommendation 96-1 (Commitment number 3, Milestone 5.2.2-3). This test report summarizes the objectives, procedures, results and conclusions of the PVT-! ..."
Abstract
- Add to MetaCart
Enclosed is the Test Summary Report for the Process Verification Test (PVT-1) which is a deliverable defined in the Implementation Plan for DNFSB Recommendation 96-1 (Commitment number 3, Milestone 5.2.2-3). This test report summarizes the objectives, procedures, results and conclusions of the PVT-!.
DNFSB 2012-1 ACTION 28-J, "EV ALU ATE ELECTRICAL COMPONENTS AND DEFINE THE SCOPE FOR
, 2013
"... This letter transmits a deliverable consistent with Commitment 2B-I of the Department of Energy's IP for DNFSB 2012-1, Savannah River Site Building 235-F Safety. The deliverable is a documented review of the Building 235-F electrical components, the plan for de-energization, and the process for ..."
Abstract
- Add to MetaCart
This letter transmits a deliverable consistent with Commitment 2B-I of the Department of Energy's IP for DNFSB 2012-1, Savannah River Site Building 235-F Safety. The deliverable is a documented review of the Building 235-F electrical components, the plan for de-energization, and the process
and Management Practices of the Hanford Site Tank Waste Remediation System
"... Commitment 5.2.2(d), requiring a deliverable to "Provide a schedule for key initial systems engineering products on the TWRS Immobilized Low-Activity Waste Interim Storage Project (Project W-465). " and proposes closure of this commitment. This commitment is identified in the DNFSB Recomme ..."
Abstract
- Add to MetaCart
Commitment 5.2.2(d), requiring a deliverable to "Provide a schedule for key initial systems engineering products on the TWRS Immobilized Low-Activity Waste Interim Storage Project (Project W-465). " and proposes closure of this commitment. This commitment is identified in the DNFSB
High Level Waste
"... Enclosed is the subject report which provides a scheduled deliverable (Commitment 5, Milestone 5.2.4-2) in accordance with the DNFSB Recommendation 96-1 Implementation Plan. This report, "Bounding Mass Transfer Coefficients for the In-Tank Precipitation Facility (U) " (HLW-I. OVP-97-0052, ..."
Abstract
- Add to MetaCart
Enclosed is the subject report which provides a scheduled deliverable (Commitment 5, Milestone 5.2.4-2) in accordance with the DNFSB Recommendation 96-1 Implementation Plan. This report, "Bounding Mass Transfer Coefficients for the In-Tank Precipitation Facility (U) " (HLW-I. OVP-97
Results 1 - 10
of
26