Searching for authors named "Frank Werner" – sorted by Relevance.
-
A Comparison of Solution Procedures for the Flow Shop Scheduling Problem with Late Work Criterion
- Jacek Błażewicz * ) Erwin Pesch 1) Małgorzata Sterna 2) Frank Werner 3) * ) Institute of Computing
- Add To MetaCart
-
Parallel machine scheduling problems with a single server
- @(email omitted); Frank Werner Otto-von-Guericke-Universität, Fakultät für Mathematik, 39106 Magdeburg, Germany frank.werner
- Cited by 4 (0 self) – Add To MetaCart
-
Open shop scheduling problems with late work criteria. Discrete Applied Mathematics 134
- ) , Małgorzata Sterna 3) , Frank Werner 4) 1) Institute of Computing Science, Poznań University of Technology
- Cited by 2 (2 self) – Add To MetaCart
-
An Enumerative Algorithm for Two-Machine Flow Shop Problems with Earliness and Tardiness Penalties
- .e., ∗ Corresponding author, email: frank.werner@(email omitted); 1 completing a job before its due date
- Add To MetaCart
-
Complexity Results for Parallel Machine Problems with a Single Server
- , Surganov Str. 6, 220012 Minsk, Belarus kravch@(email omitted); Frank Werner Otto
- Cited by 3 (1 self) – Add To MetaCart
-
F.: Heuristic Algorithms for Open Shop Scheduling to Minmize Mean Flow Time
- Algorithms Heidemarie Bräsel, André Herms, Marc Mörig, Thomas Tautenhahn, Jan Tusch, Frank Werner Otto
- Cited by 1 (1 self) – Add To MetaCart
-
P.: Metaheuristic Algorithms for Open Shop Scheduling to Minimize Mean Flow Time, Working Paper, Otto-von-Guericke-Universität
- , Heidemarie Bräsel, Marc Mörig, Jan Tusch, Frank Werner, Per Willenius Otto-von-Guericke-Universität, Fakultät
- Cited by 1 (1 self) – Add To MetaCart
-
Cyclic properties of triangular grid graphs
- HAMILTONIAN PROPERTIES OF TRIANGULAR GRID GRAPHS VALERY S. GORDON, YURY L. ORLOVICH, FRANK WERNER
- Cited by 1 (0 self) – Add To MetaCart
-
On the Calculation of the Stability Radius of an Optimal or an Approximate Schedule
- , The Netherlands Frank Werner 1 Otto-von-Guericke-Universit��at, Fakult��at f��ur Mathematik, PSF 4120, 39016
- Cited by 4 (1 self) – Add To MetaCart
-
Complexity of Scheduling Problems with Late Work Criteria
- , University of Bonn, Adenauerallee 24-42, 53113 Bonn, Germany E.Pesch@(email omitted); Frank Werner Faculty
- Add To MetaCart

